Dongguan Yize Mould Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Wang Sam
  • Company Name : Dongguan Yize Mould Co., Ltd.
  • Tel : 86-769-81888522
  • Fax : 86-769-81888548
  • Address : Guangdong,Dongguan,Hexing Road 122 of South Shatou District, Changan Town, Dongguan City, Guangdong Province. China
  • Country/Region : China
  • Zip : 523866

mould parts factory

mould parts factory
Product Detailed
Related Categories:Bushings
mould parts factory 1.Guide bushes are manufactured on order only. 2.Production time is 8 to 12 working days.

Product name

 mould parts factory

Briefly Description

 

1. machined part's material:SKD11,SKH51,NAK80, etc

2. Precision grinding less than 0.002.

3. Precision mould component with precise produce.

4. With 5 years machine parts processing experience .machine parts Manufacturer, Supplier, Factory, Exporter in china

Standard

JIS AISI DIN

Usually packaging

Paper of Box

Manufacturer

Yize Mould

Yieldly

Dongguan China

Supply capability

1000PCS/DAY

Terms of transport

Rxpress

Websites

http://www.yizemold.com  http://www.dgyize.com.cn/

Our Products

1)production mode : accroding to drawings and samples to process

2)material:high-speed steel, special material can customize. improt material: SKD11,SKH9,SKH51, SKH55

3)technique standard : according to national standard GM, JIS,DIN,AISI ect, and other national standard to making

4)technique advantage : grinding parts with precision less than 0.002, precise EDM parts with precision less than 0.005

5)utilization scope : precision punch mold, precision plastic mold, precision auto mold, precision medical  mold, precision computer connector mold and other factory automation part etc.  with many areas

6)production equipment : all machinery used from improt, with EDM ten sets. grinder 15 sets, wire-cutting, CNC, milling machinery.

7)product accuracy :  diamension tolerance +-0.001mm, axiality within 0.002mm,roundness within 0.0015mm, surface roughness within Ra0.025, straightness within 0.002

8)packaging type : Paper of Box

9)cooperation customer : China, Western, Japan, Southeast Asia

Technique information reference

 

Equipment show

Produnct show

Delivery

Within 3-10 days after received purchase order,urgent order special treatment

Terms of payment

overseas

60% deposit, 40% after received and checked the part no problem

home

cash

       

mould parts factory



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.